About SpaceOut
We’re a group of drilling and well engineers who wanted a clearer way to plan the movement of a toolstring through a subsea BOP. The driller follows bit or BHA end depth. At that same depth, the team needs to know what sits across each ram, which connection will reach it next and where the top of the string sits relative to the rig floor.
Those questions come up throughout well operations. During plug and abandonment (P&A), a team may need to compare string positions for a punching operation or follow a seal assembly as it is pulled through the stack. When planning to strip up or down during well control or annulus displacement, the sequence matters: a tool joint can pass several BOP elements between the starting and finishing depths. During cementing, the space-out must also account for the working height of the cement head.
SpaceOut brings the BOP drawing and toolstring tally for the job into two linked views. Engineers and rig crews can move the modelled string in either direction, read the axial clearance as a connection approaches a ram, and see the corresponding movement at the rig floor. Once the chosen section is positioned at the BOP, they can hold its depth and compare upper drillpipe lengths to get the surface space-out they need.
Explore the workflow →